Categories
Data
- Hope
- Iron wire
- L:26cm/W:26cm/H:50cm
- 11 December 2022
Context
2022.12.6. The model plane landed on the top of the observation platform of the stadium of Xiamen No.1 Middle School. 2022.12.11. I want to hook it and take it down with the iron wire, but the iron wire is too soft to hook. So it was folded into such a sculpture and brought back to home. 2022.12.11. Xiamen No.1 Middle School. Z. Chen